About the delivery:
PLC equipment
- S5 system replaced by S7-417-H, redundant
- Siemens PCS7 platform
- Upgraded to redundant bus controller system ET200M
- Failsafe I/O
- PROFISafe communications between PLS and I/O.
Servers and operator stations
- Installation of two servers and two operator stations, one engineering station
- LCD monitors, DNV approved
Cabinets
- Replaced old main cabinet with new Rittal cabinet
- Upgraded expansion cabinets
F&G equipment
- BS100 central unit replaced with AutroSafe central unit
- Replacement of all detectors in field
- New expansion AutroSafe panel installed